4860
Consumers Applied
Rooftop Solar
28,658.72
Capacity Applied (kW)
ROOFTOP SOLAR INSTALLATION ACTIVITIES
Consumer
- Selection of vendor from the list of empanelled vendors
- Submission of Solar Rooftop application in
- Applying for Net Meter in SNA
- Payment of rooftop system instalment along with application and metering charges
- Co-ordinate with vendor for system installation
- Collect all the necessary documents from the installer
- Signing Joint Inspection Report during plant commissioning
Installer
- Coordinating and assisting consumer for application submission in portal
- Feasibility analysis of Solar Rooftop in consumer roof
- Installation of Solar Rooftop plant as per the SNA specifications
- Testing and commissioning of plant as per DisCom/ SNA guidelines
- Signing Joint Inspection Report after plant commissioning
- Undertaking operation and maintenance of project for 5 years post commissioning
JAKEDA
- Provide checklist of documents required for consumer application
- Undertake technical feasibility of consumer application
- Scrutinization of application documents Testing, the Solar Rooftop Project and ensuring compliance of grid
- Interconnection approval and safety standards.
- Signing Joint Inspection Report after plant commissioning